1.10.1 TODOΒΆ
Verify that a source code control system is in use, with procedures to ensure that check-ins are accompanied by issues or change tickets. The source code control system should have access control and identifiable users to allow traceability of any changes.
| Level 1 | |
| Level 2 | X |
| Level 3 | X |
| CWE | NIST |
|---|---|
| 284 |